Your company account is blocked and you cannot place orders. If you have questions, please contact your company administrator.

AEMC PEL 102 - w/o sensors

Multi-Phase Power and Energy Logger, No LCD Display/Sensors

PEL102WS
PEL 102 - w/o sensors
2137.61

AEMC PEL 102 - w/o sensors

Multi-Phase Power and Energy Logger, No LCD Display/Sensors

PEL102WS
PEL 102 - w/o sensors
2137.61

The AEMC PEL 102-W/O-SENSORS (2137.61) Multi-Phase Power and Energy Logger is a simple-to-use, one, two (split phase), and three phase power/energy data logger. This unit is ideal for electricians, engineers, and contractors doing work in the area of building or system monitoring and upgrades, along with energy audits. Vital energy data is easily measured, recorded, and analyzed.

  • No LCD Display
  • No Sensors
  • Magnetic casing for power panel mounting
$1,653.00 Price $1,740.00
This item ships FREE
  • Simple-to-use, single, dual-split, three-phase power/energy logger
  • Measurement of RMS voltages/currents at 128 times per cycle, stored every second
  • Power measurements of VA, W, var
  • Energy measurements of VAh, Wh (source load), varh (quadrant indication)
  • Updated features in DataView software for configuring real-time communication with PC/report generation with pre-defined/user-defined templates
  • USB, LAN, Ethernet, Bluetooth (Class 1 wireless communication, up to 300 ft. away)
  • Minimal programming required
  • Satisfies recommendations of NEC Code 220.87
  • Power adapter allows unit to be powered from phase measurement input
  • Provides all necessary functions for power/energy data-logging for 50 Hz, 60 Hz, 400 Hz, DC distribution systems
  • Automatic recognition of connected current sensors/probes
  • Designed to work in 1000V CAT III/600V CAT IV environments
  • Equipped with four powerful magnets for mounting instrument on metallic surface
  • No LCD display on unit
Applications
  • Measure efficiency, find areas for potential savings
  • Track sub-billing occupants for energy costs
  • Assign energy costs to departments/operations within department
  • Track peak demand periods, find opportunities for surcharge reductions
  • Determine present capacity, circumvent unnecessary electrical expansion costs
  • Monitor stray voltages/neutral current
  • Verify reliability/operation of electrical machinery
  • Improve response time to solve power-related problems
  • Track energy availability/reliability of supply
  • Reduce field service time at sub-stations
  • Baseline studies for system upgrades in high-rise/office buildings
  • Remote configurations, monitoring, event loading
Specifications
  • Sampling Frequency: 128 samples per cycle
  • Data Storage Rate: 1 per second
  • Demand Period Storage Rate: 1, 2, 3, 4, 5, 6, 10, 12, 15, 20, 30, 60 min.
  • Voltage Inputs: 3 input channels
  • Current Inputs: 3 input channels
  • Ingress Protection: IP54 non-operating